Project details
| Official title | Construction of commercial Building |
|---|---|
| Status | Lapsed |
| Status since | 20 Sept 2026 |
| Application filed | 16 Dec 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Reena Wilfred Menezes |
| Land area | 700 m² |
| Project cost | ₹38 lakh |
| Village / locality | Padu |
| Taluk / tehsil | Kapu |
| District | Udupi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08219 |
In context
139 applications in Udupi since January 2022 are in the same category (Buildings & townships): 40 approved, 31 filed or under review, and 67 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.2 acres, this one is smaller than 51% of them.
28 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Padu, Kapu, Udupi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shree Veeranjaneya Mandira Seva Trust Reconstruction — lapsed, 150 m away
- Construction of Residential House by Kamalaksha Bhoja Suvarna — lapsed, 400 m away
- construction of Residential House by Sudhakara Salian — lapsed, 650 m away
- New Construction of Residential House by Shashikanth — lapsed, 1.2 km away
- Manoj Kumar Akshaya — lapsed, 1.2 km away
- New Construction of Residential House by Dayanand Suvarna — lapsed, 1.2 km away
- New Construction of Residential House by Indira Bangera — lapsed, 1.4 km away
- New Construction of Residential House by Chandrashekar S Puthran — lapsed, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.