Project details
| Official title | Construction of residential House |
|---|---|
| Status | More information requested |
| Status since | 16 Oct 2026 |
| Application filed | 18 Sept 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Rashmi George |
| Land area | 300 m² |
| Project cost | ₹42 lakh |
| Village / locality | Udiyavara |
| Taluk / tehsil | Udupi |
| District | Udupi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08238 |
In context
139 applications in Udupi since January 2022 are in the same category (Buildings & townships): 40 approved, 31 filed or under review, and 67 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.1 acres, this one is smaller than 72% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Udiyavara, Udupi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Residential House by Sunitha Thingalaya — lapsed, 600 m away
- Construction of Residential House by P N Vandana Rao — lapsed, 800 m away
- Re-Construction of Residential House — lapsed, 900 m away
- Treated Water Disposal Pipeline — lapsed, 1.1 km away
- Residential Building by Bola Damodar Kamath — lapsed, 1.1 km away
- Construction of residential House by Lavina Oberoi — lapsed, 1.2 km away
- River Protection Works near Sathish Amin and Sarasu Poojary's House at… — coastal clearance granted, 1.4 km away
- Construction of Etp — lapsed, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.