Quick answers
What is Waterways on the Kali river (NW-52)?
Waterways on the Kali river (NW-52) is a lapsed building project in Wailvada, Karwar, Uttara Kannada, Karnataka. The site covers 0 acres.
Who is building it?
The applicant is Manjunath Prasad.
Has it been approved?
No. The application was lapsed on 25 Nov 2026, so it is no longer under consideration.
Where is it?
In Wailvada, Karwar, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹19.7 crore and a site of 0 acres.
When was it filed?
The application was filed on 5 Sept 2026.
Project details
| Official title | Proposed Development of Waterways on the Kali river (NW-52) at Chitthakula Village, Karwar Taluk, Uttara Kannada District, Karnataka |
|---|---|
| Status | Lapsed |
| Status since | 25 Nov 2026 |
| Application filed | 5 Sept 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Manjunath Prasad |
| Land area | 200 m² |
| Project cost | ₹19.7 crore |
| Village / locality | Wailvada |
| Taluk / tehsil | Karwar |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08405 |
In context
93 applications in Uttara Kannada since January 2022 are in the same category (Buildings & townships): 6 approved, 27 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0 acres, this one is smaller than 99% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Wailvada, Karwar, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Providing Ugd System for Treating Nullah Sewage at Karwar Town on Short Term… — lapsed, 900 m away
- Eco-Tourism — lapsed, 1000 m away
- Proposed Retaining Wall cum Road (levee) from Kali River Garden of Kodibag… — lapsed, 1000 m away
- Providing Ugd System for Treating Nullah Sewage at Karwar Town on Short Term… — lapsed, 1.2 km away
- Providing UGD System for treating Nullah sewage at Karwar Town on short term… — lapsed, 1.3 km away
- Providing UGD System for treating Nullah sewage at Karwar town on Short term… — lapsed, 1.7 km away
- Renewal of lease of 0.4858 ha of forest land in F.Sy No. 108A1 of Kodibag… — under forest review, 2.4 km away
- Renewal of lease of 0.4858 ha of forest land in F.Sy No. 108A1 of Kodibag… — lapsed, 2.4 km away
More from Manjunath Prasad in Uttara Kannada
- Dredging in Gangavali River at Shirur Landslide Area — coastal clearance granted
- Tadadi-Aghanashini ferry Line, in Kumta Taluka of Uttara Kannada District,… — coastal clearance granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.