Quick answers
What is this project?
Proposed Pipeline from port to Proposed Physical Refinery unit at Mangalore located at Plot No. B1, Baikampady Industrial Estate Road, Opposite R.C.H.W. quarters, Near IPL godown is an approved port and coastal project in Baikampadi, Mangaluru, Dakshina Kannada, Karnataka. The site covers 7.3 acres.
Who is building it?
The applicant is Tulluri Varaprasadarao.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 14 Feb 2024), as of 27 Nov 2026.
Where is it?
In Baikampadi, Mangaluru, Dakshina Kannada, Karnataka.
How big is it?
It has a stated cost of ₹3 crore and a site of 7.3 acres.
When was it filed?
The application was filed on 9 Oct 2023.
Project details
| Status | Coastal clearance granted |
|---|---|
| Status since | 14 Feb 2024 |
| Application filed | 9 Oct 2023 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Tulluri Varaprasadarao |
| Land area | 7.3 acres (3 ha) |
| Project cost | ₹3 crore |
| Village / locality | Baikampadi |
| Taluk / tehsil | Mangaluru |
| District | Dakshina Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08414 |
In context
47 applications in Dakshina Kannada since January 2022 are in the same category (Ports & coast): 27 approved, 4 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 7.3 acres, this one is larger than 86% of them.
124 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baikampadi, Mangaluru, Dakshina Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Formulation of Amino Resin, Phenol Formaldehyde Resin, and Starch… — environmental approval granted, 550 m away
- Proposed Formulation of Amino Resin, Phenol Formaldehyde Resin, and Starch… — returned to applicant, 550 m away
- Proposed Formulation of Amino Resin, Phenol Formaldehyde Resin, and Starch… — cleared for impact study, 550 m away
- Harishchandra Narasappa Pangal — lapsed, 650 m away
- Existing pipeline from berth No. 5 of New Mangalore Port Authority to… — lapsed, 800 m away
- Srinivasa Narasappa Pangal — lapsed, 850 m away
- Residential Building by Shrinivas N Pangal — coastal clearance granted, 850 m away
- Residential Building by Deepa — coastal clearance granted, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.