One of 2 filings for this project. The project's main page, with every filing and where each stands: Removal of Sand by Maintenance Dredging From Adjoining Waterfront Area
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 28 Dec 2023 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Waterways Shipyard PVT LTD |
| Land area | 1.7 acres (0.7 ha) |
| Project cost | ₹33 lakh |
| Village / locality | Bala Kudru |
| Taluk / tehsil | Brahmavara |
| District | Udupi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08449 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Dec 2024 | Lapsed | 1.7 acres | ₹1 crore |
| New project filed 28 Dec 2023 (this page) | Lapsed | 1.7 acres | ₹33 lakh |
In context
10 applications in Udupi since January 2022 are in the same category (Ports & coast): 5 approved, 0 filed or under review, and 5 withdrawn, lapsed or rejected.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bala Kudru, Brahmavara, Udupi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Removal of Sand by Maintenance Dredging From Adjoining Waterfront Area — lapsed, 0 m away
- Development of Coastal Berth at Hangarakatte, Udupi District Karnataka — environmental approval granted, 250 m away
- Development of Coastal Berth at Hangarakatte, Udupi District Karnataka — coastal clearance granted, 250 m away
- Development of Coastal Berth at Hangarakatte, Udupi District Karnataka — cleared for impact study, 250 m away
- Kharland at Selected Reaches Of Seetha River at Kodi Bengre In Kodi Grama… — coastal clearance granted, 700 m away
- Commercial Resort for tourism Purpose — lapsed, 1.7 km away
- Repair Old Authorized Residential House — lapsed, 1.8 km away
- Kharland at Kambalakatta in Harady gramapanchayath limit of Udupi Taluk &… — coastal clearance granted, 2.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.