Project details
| Official title | Development and River tank Protection work to Rajady River flowing near Hoskali of Katbelthuru Gramapanchayath, in Kundapura Taluk |
|---|---|
| Status | Lapsed |
| Status since | 31 Aug 2026 |
| Application filed | 9 Jan 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Executive Engineer Knnl Varahi Project |
| Land area | 6.6 acres (2.7 ha) |
| Project cost | ₹5 crore |
| Village / locality | Talluru |
| Taluk / tehsil | Kundapura |
| District | Udupi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08538 |
In context
6 applications in Udupi since January 2022 are in the same category (Water & irrigation): 1 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Talluru, Kundapura, Udupi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Development and River bank Protection work to Rajady River flowing near… — coastal clearance granted, 0 m away
- Development and River bank Protection work to Rajady River flowing near… — lapsed, 200 m away
- Construction of Petrol Pump — lapsed, 650 m away
- Kharland at Selected Stretches from Hosahoklu House to Samsalkadu in Thallur… — coastal clearance granted, 1.4 km away
- Re-Construction of Residential House — lapsed, 2.3 km away
- Development Work of Ring Road Connecting All the Roads in Kundapura City… — coastal clearance granted, 2.7 km away
- Kharland at Selected Reaches of Gangolli River From Santhosh Nagar to… — coastal clearance granted, 2.8 km away
- "Sand Block Quarry SB-48" of Executive Engineer — environmental approval granted, 3.7 km away
More from Executive Engineer Knnl Varahi Project in Udupi
- Barrage/ Swed Across Swarna River at Uppuru and Parari to Recharge of Ground… — coastal clearance granted
- Barrage/ Swed Across Swarna River at Uppuru, Parari and Havanje to Recharge of… — lapsed
- Development and River bank Protection work to Rajady River flowing near… — coastal clearance granted
- Development and River bank Protection work to Rajady River flowing near… — lapsed
5 Executive Engineer Knnl, Karnataka projects in Udupi
All 6 Executive Engineer Knnl, Karnataka projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.