Project details
| Official title | River Bank protection work near Laxman Mogera House at Nandanavana Village of kergal Grama Panchayath Byndoor taluk Udupi |
|---|---|
| Status | More information requested |
| Status since | 12 Nov 2026 |
| Application filed | 16 Jun 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Minor Irrigation and Ground Water Development Subdivision |
| Project cost | ₹2 crore |
| Village / locality | Bijuru |
| Taluk / tehsil | Bainduru |
| District | Udupi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08624 |
In context
139 applications in Udupi since January 2022 are in the same category (Buildings & townships): 40 approved, 31 filed or under review, and 67 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bijuru, Bainduru, Udupi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential House at Sy No 36/3A of Nandanavana Village — lapsed, 600 m away
- Kharland at selected stretches from Arate Bridge to Kunjibail in Hosadu Grama… — coastal clearance granted, 1.2 km away
- Constructing Proposed 110KV Sc Line on Existing Mc Tower From Location No.1… — initial checks, 2.9 km away
- Proposed 110KV SC Line on DC towers from the existing 110/33/11KV Navunda Sub-… — lapsed, 3 km away
- Improvement works to Salt Water Exclusion Dam at Beskuru, construction of Salt… — more information requested, 3.3 km away
- Priliminary Exploration (G-3 Stage) for Aluminous Laterite and Associated… — in-principle approval, conditions pending, 3.8 km away
- Priliminary Exploration (G-3 Stage) for Aluminous Laterite and Associated… — not approved, 3.8 km away
- "priliminary Exploration (G-3 Stage) Foraluminous Laterite and… — initial checks, 3.8 km away
More from Minor Irrigation and Ground Water Development Subdivision in Udupi
- Improvement works to Salt Water Exclusion Dam at Beskuru, construction of Salt… — more information requested
- Riverbank Protection Work — coastal clearance granted
- Kharland at Selected Reaches of Gangolli River From Santhosh Nagar to… — coastal clearance granted
- Kharland at Selected stretches from Holekere Temple to Bagwadi bridge and at… — coastal clearance granted
- Construction of Swed at Hosahithlu Kirimajeshwara — coastal clearance granted
- Kharland at selected reaches of Halady River Near TT Road, Kaipadi Garadi — coastal clearance granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.