Project details
| Official title | Construction of Temporary Structure for Tourism Purpose at Sy No 220/1 of Nadsalu Village Kaup Taluk. |
|---|---|
| Status | Lapsed |
| Status since | 17 Jul 2026 |
| Application filed | 5 Jun 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Christine Rita Dsouza Thabot |
| Land area | 1,900 m² |
| Project cost | ₹2.8 crore |
| Village / locality | Hejamadi |
| Taluk / tehsil | Kapu |
| District | Udupi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08640 |
In context
139 applications in Udupi since January 2022 are in the same category (Buildings & townships): 40 approved, 31 filed or under review, and 67 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.5 acres, this one is larger than 68% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hejamadi, Kapu, Udupi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sea Erosion Protection wall Work near Nadipatna sea shore — lapsed, 350 m away
- Riverbank Protection Work — coastal clearance granted, 800 m away
- NOC for Scrapping of Tug Alliance — lapsed, 1.9 km away
- Construction of Residential House by Smithaa Shetty — lapsed, 2.6 km away
- Re-Construction of Residntial House — lapsed, 3.2 km away
- Construction of Residential Building by Gulabi — lapsed, 3.6 km away
- Contraction Temporary Commercial Building For Tourism Propose — coastal clearance granted, 4.8 km away
- Scylla Luxury Resorts and Spa by Royal Dream Beach Resort — lapsed, 4.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.