Project details
| Official title | Construction of Residential House |
|---|---|
| Status | Lapsed |
| Status since | 6 Feb 2025 |
| Application filed | 7 Dec 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Keshav N Mendon |
| Land area | 400 m² |
| Project cost | ₹26 lakh |
| Village / locality | Manuru |
| Taluk / tehsil | Brahmavara |
| District | Udupi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08685 |
In context
139 applications in Udupi since January 2022 are in the same category (Buildings & townships): 40 approved, 31 filed or under review, and 67 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.1 acres, this one is smaller than 58% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Manuru, Brahmavara, Udupi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Residential House by Sharada — lapsed, 50 m away
- Re Construction of Residential house — lapsed, 400 m away
- Re Construction of Residential House — lapsed, 450 m away
- Constrution of ETP — lapsed, 800 m away
- Gosval Maitreya Ayurvedic Dispensary — coastal clearance granted, 850 m away
- Gosval Maitreya Ayurvedic Ashram and Dispensary — lapsed, 850 m away
- Discharge of 390 KLD Treated wastewater into the sea from Janatha Fish Meal… — under coastal review, 1.1 km away
- Constrution of ETP — lapsed, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.