Project details
| Status | Withdrawn |
|---|---|
| Status since | 6 Nov 2026 |
| Application filed | 6 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Ranjitpura Infrastructure Private Limited |
| Land area | 233.8 acres (94.6 ha) |
| Project cost | ₹471 crore |
| Village / locality | Ranjitpur |
| Taluk / tehsil | Sandur |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08786 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 7 Nov 2026 | More information requested | 233.8 acres | ₹471 crore |
| Early planning filed 6 Nov 2026 (this page) | Withdrawn | 233.8 acres | ₹471 crore |
In context
80 applications in Ballari since January 2022 are in the same category (Industry): 45 approved, 15 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 233.8 acres, this one is larger than 61% of them.
41 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ranjitpur, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing Sponge Iron Capacity From 190 Tpd to 375 Tpd (Existing… — more information requested, 0 m away
- Expansion of Existing Sponge Iron Capacity From 190 Tpd to 375 Tpd (Existing… — cleared for impact study, 0 m away
- Expansion of Existing Sponge Iron Capacity From 190 Tpd to 375 Tpd (Existing… — cleared for impact study, 0 m away
- Diversion of 3.862 Ha for Road Purpose of Forest land in Connection with… — lapsed, 1.7 km away
- Donimalai Iron Ore Mine — environmental approval granted, 2 km away
- Donimalai Iron Ore Mines — withdrawn, 2 km away
- Diversion proposal for an extent of 0.67 ha of forest land in Devadari Range,… — lapsed, 2.1 km away
- Transfer of FC (Stage II FC vide F.No.4-KRB 1483/2022-BAN/321, 19-09-2024 )… — lapsed, 2.1 km away
More from Ranjitpura Infrastructure Private Limited in Ballari
- Expansion of Existing Sponge Iron Capacity From 190 Tpd to 375 Tpd (Existing… — cleared for impact study
- Expansion of Existing Sponge Iron Capacity From 190 Tpd to 375 Tpd (Existing… — cleared for impact study
All 4 Ranjitpura Infrastructure projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.