Quick answers
What is this project?
Providing Water Supply System To Chikkaballapur city, Chintamani city, Gowribidanur city & 8 enroute villages, Bagepalli & Gudibande towns under Amrut 2.0 including Operation & Maintenance for a period of 5 years through Design, Build, Operation and Transfer (DBOT) mode is a proposed water and irrigation project in Puttapurlahalli, Gauribidanur, Chikkaballapura, Karnataka. The site covers 10.9 acres.
Who is building it?
The applicant is Daniya Fairoz.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Puttapurlahalli, Gauribidanur, Chikkaballapura, Karnataka.
How big is it?
It has a stated cost of ₹40 crore; a site of 10.9 acres and 2,250 m² of forest land.
When was it filed?
The application was filed on 7 Nov 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 7 Nov 2026 |
| Application filed | 7 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Daniya Fairoz |
| Land area | 10.9 acres (4.4 ha) |
| Forest land | 2,250 m² |
| Project cost | ₹40 crore |
| Village / locality | Puttapurlahalli |
| Taluk / tehsil | Gauribidanur |
| District | Chikkaballapura |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08803 |
In context
6 applications in Chikkaballapura since January 2022 are in the same category (Water & irrigation): 0 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected.
Where it is
Puttapurlahalli, Gauribidanur, Chikkaballapura, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gowribidanur 4th Phase Industrial Area (187.24 Ha) by Karnataka Industrial… — more information requested, 5.8 km away
- Gowribidanuru 3rd Phase Industrial Area — environmental approval granted, 6.8 km away
- Gowribidanuru 3rd Phase Industrial Area — cleared for impact study, 6.8 km away
- Hazardous Waste Incinerator Facility by M/s O2 Eco Park private Limited — environmental approval granted, 8.3 km away
- Hazardous Waste Incinerator Facility by M/s O2 Eco Park private Limited — returned to applicant, 8.3 km away
- Hazardous Waste Incinerator Facility by M/s O2 Eco Park private Limited — cleared for impact study, 8.3 km away
- M/s O2 Eco Park Private Limited — lapsed, 8.3 km away
- M/s Eco Park Private Limited — lapsed, 8.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.