Quick answers
What is this project?
Regularization of existing Re-Rolling mill by M/s. Palakkad Steels Pvt. Ltd is a proposed industrial project in Pudusseri Central, Palakkad, Kerala. The site covers 0.8 acres.
Who is building it?
The applicant is Palakkad Steels Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Pudusseri Central, Palakkad, Kerala.
How big is it?
It has a stated cost of ₹6.4 crore and a site of 0.8 acres.
When was it filed?
The application was filed on 18 Jul 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 18 Jul 2023 |
| Application filed | 18 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Palakkad Steels Private Limited |
| Land area | 3,200 m² |
| Project cost | ₹6.4 crore |
| Village / locality | Pudusseri Central |
| Taluk / tehsil | Palakkad |
| District | Palakkad |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-00073 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 May 2024 | Lapsed | 0.8 acres | ₹6.4 crore |
| Early planning filed 18 Jul 2023 (this page) | More information requested | 0.8 acres | ₹6.4 crore |
In context
24 applications in Palakkad since January 2022 are in the same category (Industry): 10 approved, 8 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.8 acres, this one is smaller than 100% of them.
34 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pudusseri Central, Palakkad, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regularization of existing Re-Rolling mill by M/s. Palakkad Steels Pvt. Ltd — lapsed, 0 m away
- Industrial project by YESEMM Steel Products Kanjikode Pvt LTD — forest land use approved, 850 m away
- Steel making and rolling mill unit by M/s. YESEMM STEEL PRODUCTS (KANJIKKODU)… — environmental approval granted, 1.3 km away
- Steel making and rolling mill unit by M/s. YESEMM STEEL PRODUCTS (KANJIKKODU)… — cleared for impact study, 1.3 km away
- Regularization of Existing Steel Making and Rolling Mill by M/S. Beepath… — lapsed, 1.5 km away
- Regularization of Existing Steel Making and Rolling Mill by M/S. Beepath… — more information requested, 1.5 km away
- Road Access to New Industrial Development Area Kanjikode (NIDA) — more information requested, 2.7 km away
- GRANITE BUILDING STONE QUARRY OF Mr. ANTONY MARTIN M I — under environmental review, 2.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.