Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Apr 2023 |
| Application filed | 15 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vsc Villaments |
| Land area | 6.7 acres (2.7 ha) |
| Project cost | ₹6.5 crore |
| Village / locality | Aryanad |
| Taluk / tehsil | Nedumangad |
| District | Thiruvananthapuram |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-00153 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Nov 2023 | Under wildlife review | 6.7 acres | ₹6.5 crore |
| New project filed 15 Apr 2023 (this page) | Environmental approval granted | 6.7 acres | ₹6.5 crore |
In context
62 applications in Thiruvananthapuram since January 2022 are in the same category (Mining): 29 approved, 24 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 6.7 acres, this one is larger than 68% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Aryanad, Nedumangad, Thiruvananthapuram, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone Minor Mineral Mining (Quarry) project of M/s VSC Villaments at… — under wildlife review, 0 m away
- JJM- Water Supply Scheme to Aryanadu and Uzhamalakkal Panchayaths-… — lapsed, 2.8 km away
- Jjm-Water Supply Scheme to Aryanadu and Uzhamalakkal Panchayaths-Distribution… — lapsed, 2.8 km away
- Wildlife Clearance for the proposed New Building Stone (Minor Mineral) Mining… — under wildlife review, 3.7 km away
- Wildlife Clearance for the proposed New Building Stone (Minor Mineral) Mining… — under wildlife review, 3.7 km away
- Mining project by M/s Daiwik Industries Pvt. Ltd. — environmental approval granted, 3.7 km away
- Proposed granite building stone quarry of Mr. ABOOBACKER SIDDIK S Y — under environmental review, 5 km away
- Renewal of lease agreement between KWA and Forest Department at Peppara Dam — under forest review, 7.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.