Quick answers
What is Ummer?
Ummer is an approved mining project in Wandur, Nilambur, Malappuram, Kerala. The site covers 2.4 acres.
Who is building it?
The applicant is Ummer.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Mar 2023), as of 27 Nov 2026.
Where is it?
In Wandur, Nilambur, Malappuram, Kerala.
How big is it?
It has a stated cost of ₹1 lakh and a site of 2.4 acres.
When was it filed?
The application was filed on 10 Mar 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Mar 2023 |
| Application filed | 10 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ummer |
| Land area | 2.4 acres (1 ha) |
| Project cost | ₹1 lakh |
| Village / locality | Wandur |
| Taluk / tehsil | Nilambur |
| District | Malappuram |
| State | Kerala |
| Location from | Site area on record |
| Our reference | WID-KL-00169 |
In context
335 applications in Malappuram since January 2022 are in the same category (Mining): 125 approved, 143 filed or under review, and 67 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 2.4 acres, this one is smaller than 61% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Wandur, Nilambur, Malappuram, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Granite Building Stone Quarry of Josekutty — more information requested, 2.4 km away
- GRANITE BUILDING STONE QUARRY OF Mr. JOSE KUTTY (EC TRANSFER FROM DEIAA TO… — withdrawn, 2.4 km away
- GRANITE BUILDING STONE QUARRY OF Mr.SAFEER.K — environmental approval granted, 5.1 km away
- Granite Building Stone Quarry Ec Transfer — under environmental review, 5.2 km away
- Granite Building Stone Quarry of Safeer. K — under environmental review, 5.2 km away
- Granite Building Stone Quarry of Safeer. K — not approved, 5.2 km away
- Granite Building Stone Quarry of Aneesh Babu — under environmental review, 5.3 km away
- Granite Building Stone Quarry of SAJEER MOYIN — under environmental review, 9.2 km away
More from Ummer in Malappuram
- Ordinary Clay Project of Ummer — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.