What is Proposed Granite Building Stone Quarry of Mr. Binu George?
Proposed Granite Building Stone Quarry of Mr. Binu George is a proposed mining project in Nedumkandam, Udumbanchola, Idukki, Kerala. The site covers 7.4 acres.
Who is building it?
The applicant is Binu George.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Nedumkandam, Udumbanchola, Idukki, Kerala.
How big is it?
It has a stated cost of ₹2.8 crore and a site of 7.4 acres.
When was it filed?
The application was filed on 10 May 2023.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 10 May 2023 |
| Application filed | 10 May 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Binu George |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹2.8 crore |
| Village / locality | Nedumkandam |
| Taluk / tehsil | Udumbanchola |
| District | Idukki |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-00306 |
In context
32 applications in Idukki since January 2022 are in the same category (Mining): 7 approved, 20 filed or under review, and 5 withdrawn, lapsed or rejected. At 7.4 acres, this one is larger than 63% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Nedumkandam, Udumbanchola, Idukki, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jal Jeevan Mission (JJM)-JJM - WSS TO NEDUMKANDAM, PAMPADUMPARA, UPPUTHARA… — forest land use approved, 15 km away
- Jal Jeevan Mission (JJM)-JJM - WSS TO NEDUMKANDAM, PAMPADUMPARA, UPPUTHARA… — decision issued, 15 km away
- Jal Jeevan Mission (JJM)- WSS to Konnathady, Udumbanchola, and Rajakkad,… — under forest review, 18.8 km away
- Jal Jeevan Mission (JJM)- WSS to Konnathady, Udumbanchola, and Rajakkad,… — forest land use approved, 18.8 km away
- Construction of Ayyappan Kovil Bridge — more information requested, 22.3 km away
- USOF 4G Saturation Project_ Idukki Wildlife — decision issued, 23 km away
- Mission 500 Category 2_Idukki Wildlife Division — lapsed, 23 km away
- Mission 500 Category 2_Idukki Wildlife Division — more information requested, 23 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.