What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Thrissur, Kerala

Environmental Clearance for the Proposed Residential Project to Be Developed by M/S Kalyan Developers

Environmental Clearance for the Proposed Residential Project to Be Developed by M/S Kalyan Developers is an approved residential project in Trissur, Thrissur, Kerala. It plans 121 units in 1 tower of up to 29 floors on 1.5 acres. Its stated project cost is ₹145.8 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 19 Nov 2025).

See it on the live map All projects in Thrissur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Environmental Clearance for the Proposed Residential Project to Be Developed by M/S Kalyan Developers is an approved residential project in Trissur, Thrissur, Kerala. It plans 121 units in 1 tower of up to 29 floors on 1.5 acres.

Who is building it?

The applicant is Kalyan Developers.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 19 Nov 2025), as of 27 Nov 2026.

Where is it?

In Trissur, Thrissur, Kerala.

How big is it?

It has a stated cost of ₹145.8 crore and a site of 1.5 acres.

When was it filed?

The application was filed on 5 Nov 2024.

Project details

StatusEnvironmental approval granted
Status since19 Nov 2025
Application filed5 Nov 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantKalyan Developers
UseResidential
Units121
Towers1
Floors (tallest)29
Height90 m
Parking spaces198
Land area1.5 acres (0.6 ha)
Built-up area33,816 m² (3,63,992 sq ft)
Plot area6,090 m² (65,552 sq ft)
Project cost₹145.8 crore
Village / localityTrissur
Taluk / tehsilThrissur
DistrictThrissur
StateKerala
Location fromSite boundary on record
Our referenceWID-KL-00572

In context

64 applications in Thrissur since January 2022 are in the same category (Buildings & townships): 3 approved, 35 filed or under review, and 26 withdrawn, lapsed or rejected. At 1.5 acres, this one is smaller than 89% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Trissur, Thrissur, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.