Quick answers
What is this project?
Building Stone Minor Mineral Mining (Quarry) project of M/s Tulunad Granites is a proposed mining project in Bedadka, Kasaragod, Kerala. The site covers 17.5 acres.
Who is building it?
The applicant is Tulunad Granites.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 17 Dec 2024), as of 27 Nov 2026.
Where is it?
In Bedadka, Kasaragod, Kerala.
How big is it?
It has a stated cost of ₹8.8 crore and a site of 17.5 acres.
When was it filed?
The application was filed on 14 Jun 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 17 Dec 2024 |
| Application filed | 14 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Tulunad Granites |
| Land area | 17.5 acres (7.1 ha) |
| Project cost | ₹8.8 crore |
| Village / locality | Bedadka |
| Taluk / tehsil | Kasaragod |
| District | Kasaragod |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-00761 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Oct 2025 | Under environmental review | 17.5 acres | ₹8.8 crore |
| Early planning filed 14 Jun 2024 (this page) | Cleared for impact study | 17.5 acres | ₹8.8 crore |
In context
64 applications in Kasaragod since January 2022 are in the same category (Mining): 22 approved, 28 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 17.5 acres, this one is larger than 97% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Bedadka, Kasaragod, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone Minor Mineral Mining (Quarry) project of M/s Tulunad Granites — under environmental review, 0 m away
- Laterite Building Stone Quarry of Mr. Kunhikannan T — lapsed, 950 m away
- Mr. Marankavil Madhusoodhanan, Managing Director, M/s Kunchiri granite… — under environmental review, 1.5 km away
- Checkdam Across Payaswini River at Erinhipuzha in Muliyar Grama Panchayath — lapsed, 2 km away
- KIIFB-Construction of Chotta Bridge across Payasini River at Km. 4/000 of… — lapsed, 3.2 km away
- Kuniyeri Anganvadi Chettathod Road — lapsed, 3.4 km away
- Kuniyeri Chettathod Road — lapsed, 3.8 km away
- JJM - Muliyar Pachayath-WSS to Chengala, Muliyar,Madhur, Mogral puthur… — forest land use approved, 3.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.