One of 3 filings for this project. The project's main page, with every filing and where each stands: Re-appraisal of EC issued by DEIAA through SEAC/SEIAA, Kerala for the project Granite…
Project details
| Status | More information requested |
|---|---|
| Status since | 31 Oct 2026 |
| Application filed | 30 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Somasekharan Nair Velayudhan Pillai |
| Land area | 11.1 acres (4.5 ha) |
| Project cost | ₹2.4 crore |
| Village / locality | Aruvikkara |
| Taluk / tehsil | Nedumangad |
| District | Thiruvananthapuram |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-00766 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 10 Sept 2025 | Withdrawn | 11.1 acres | ₹2.4 crore |
| New project filed 30 Aug 2024 (this page) | More information requested | 11.1 acres | ₹2.4 crore |
| Early planning filed 8 Dec 2023 | Cleared for impact study | 11.1 acres | ₹2.4 crore |
In context
62 applications in Thiruvananthapuram since January 2022 are in the same category (Mining): 29 approved, 24 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 11.1 acres, this one is larger than 84% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Aruvikkara, Nedumangad, Thiruvananthapuram, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-appraisal of EC issued by DEIAA through SEAC/SEIAA, Kerala for the project… — withdrawn, 0 m away
- Re-appraisal of EC issued by DEIAA through SEAC/SEIAA, Kerala for the project… — cleared for impact study, 0 m away
- Proposed granite building stone quarry of Mr. SANAL KUMAR. S — under environmental review, 6.2 km away
- Grnaite Building Stone Quarry Project of Mr. J. Madhusoodhanan — environmental approval granted, 7 km away
- Proposed Apartment Building 'Artech Zenith' — initial checks, 7.2 km away
- 4/6 laning of Greenfield Outer Ring Road Project, Navaikulam - Thekkada -… — environmental approval granted, 7.7 km away
- 4/6 laning of Greenfield Outer Ring Road Project, Navaikulam - Thekkada -… — cleared for impact study, 7.7 km away
- Proposed granite building stone quarry of Mr. ABOOBACKER SIDDIK S Y — under environmental review, 8.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.