Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Oct 2025 |
| Application filed | 29 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Sreedhanya Homes Private Limited |
| Use | Residential |
| Units | 250 |
| Towers | 2 |
| Floors (tallest) | 15 |
| Basements | 1 |
| Height | 56 m |
| Parking spaces | 350 |
| Land area | 1.9 acres (0.8 ha) |
| Built-up area | 44,000 m² (4,73,612 sq ft) |
| Plot area | 7,691 m² (82,785 sq ft) |
| Project cost | ₹131.2 crore |
| Village / locality | Kazhakkuttam Menamkulam |
| Taluk / tehsil | Thiruvananthapuram |
| District | Thiruvananthapuram |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-00911 |
In context
48 applications in Thiruvananthapuram since January 2022 are in the same category (Buildings & townships): 22 approved, 22 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 1.9 acres, this one is smaller than 67% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kazhakkuttam Menamkulam, Thiruvananthapuram, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed I.T. Office Building Construction Project to be developed by M/s AMG… — environmental approval granted, 800 m away
- Proposed IT Building Construction Project to be developed by M/s Brigade… — under environmental review, 800 m away
- Proposed Building Construction Project consists of Retail, Office, Hotel,… — environmental approval granted, 1.8 km away
- Proposed Building Construction Project consists of Retail, Office, Hotel,… — cleared for impact study, 1.8 km away
- Environmental Clearance for the proposed Residential project to be developed… — environmental approval granted, 2.1 km away
- Proposed Expansion of existing Engineering College Campus to be developed by… — under environmental review, 2.1 km away
- Application for Change of Name mentioned in the Environmental Clearance Order… — under environmental review, 2.4 km away
- Proposed I.T. Office Building Construction to be developed by M/s HiLITE… — environmental approval granted, 2.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.