Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Aug 2026 |
| Application filed | 8 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sm Mines |
| Land area | 2.4 acres (1 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Neduvattur |
| Taluk / tehsil | Kottarakkara |
| District | Kollam |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-00961 |
In context
70 applications in Kollam since January 2022 are in the same category (Mining): 37 approved, 22 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 2.4 acres, this one is smaller than 76% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 10.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Neduvattur, Kottarakkara, Kollam, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laterite Building Stone Quarry Project of Mr.Muraleedharan. L — environmental approval granted, 50 m away
- Proposed granite building stone quarry of M/s. SHREE GANESH CRUSHED MATERIALS… — environmental approval granted, 250 m away
- Granite Building Stone Quarry of Dileesh Kumar — not approved, 950 m away
- Granite Building Stone Quarry of Haridarsh B S — environmental approval granted, 1.8 km away
- Granite Building Stone Quarry of Mr. Mohanan.G — environmental approval granted, 2.5 km away
- Proposed granite building stone quarry of Mr. K G Ajikumar — environmental approval granted, 5.4 km away
- Granite Building Stone Quarry of Mr. Santhosh R — lapsed, 5.5 km away
- Proposed expansion of existing Institute of Technology Building Construction… — initial checks, 5.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.