Quick answers
What is Granite Building Stone Quarry of Sri. Faizal K.P?
Granite Building Stone Quarry of Sri. Faizal K.P is a proposed mining project in Pukkottur, Ernad, Malappuram, Kerala. The site covers 2.4 acres.
Who is building it?
The applicant is Faizal Kondotty Paramban.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Pukkottur, Ernad, Malappuram, Kerala.
How big is it?
It has a stated cost of ₹1.6 crore and a site of 2.4 acres.
When was it filed?
The application was filed on 22 Sept 2025.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 23 Oct 2026 |
| Application filed | 22 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Faizal Kondotty Paramban |
| Land area | 2.4 acres (1 ha) |
| Project cost | ₹1.6 crore |
| Village / locality | Pukkottur |
| Taluk / tehsil | Ernad |
| District | Malappuram |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-01027 |
In context
335 applications in Malappuram since January 2022 are in the same category (Mining): 125 approved, 143 filed or under review, and 67 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 2.4 acres, this one is smaller than 61% of them.
No other mining lease on record is within 500 m of this site; 41 have applied within 5 km.
Where it is
Pukkottur, Ernad, Malappuram, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Noufal.K — environmental approval granted, 1.1 km away
- Noufal K — not approved, 1.1 km away
- Mining project by Rox Silicon PVT LTD — under environmental review, 1.2 km away
- Mining project by Rox Silicon PVT LTD — cleared for impact study, 1.2 km away
- Palakkan Abdul Azeez — under environmental review, 1.3 km away
- Palakkan Abdul Azeez — cleared for impact study, 1.3 km away
- Granite Building Stone Quarry of Mr. Ummer — initial checks, 1.6 km away
- Granite Building Stone Quarry of Mr. Ummer — cleared for impact study, 1.6 km away
More from Faizal Kondotty Paramban in Malappuram
- Laterite building stone quarry of Mr. Faizal. K. P — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.