One of 2 filings for this project. The project's main page, with every filing and where each stands: Laterite Building Stone Quarry of K Balan
Project details
| Status | Initial checks |
|---|---|
| Status since | 4 Oct 2025 |
| Application filed | 4 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kodakkaran Balan |
| Land area | 1,400 m² |
| Project cost | ₹5 lakh |
| Village / locality | Pariyaram |
| Taluk / tehsil | Taliparamba |
| District | Kannur |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-01037 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Oct 2025 (this page) | Initial checks | 0.3 acres | ₹5 lakh |
| New project filed 22 Jul 2023 | Environmental approval granted | 0.2 acres | ₹4 lakh |
In context
349 applications in Kannur since January 2022 are in the same category (Mining): 186 approved, 109 filed or under review, and 54 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 0.3 acres, this one is smaller than 82% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 1.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 24 mining leases have applied within 5 km.
Where it is
Pariyaram, Taliparamba, Kannur, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laterite Building Stone Quarry of K Balan — environmental approval granted, 50 m away
- Laterite Building Stone Quarry of Ahammed Kunji ATP — environmental approval granted, 300 m away
- Laterite Building Stone Quarry of Abdul Muthalib Vachapurath — under environmental review, 350 m away
- Laterite Building Stone Quarry of Binu Varghese — environmental approval granted, 350 m away
- Laterite Building Stone quarry of Anas P — environmental approval granted, 550 m away
- Laterite Building Stone Quarry of P Babu — environmental approval granted, 600 m away
- Laterite Building Stone Quarry of George PV — environmental approval granted, 1.1 km away
- Laterite Building Stone quarry of George P V — environmental approval granted, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.