Quick answers
What is this project?
Composite Environmental Clearance and CRZ Clearance for the Proposed Expansion of existing Resort & Spa building construction project to be developed by M/s Khanna Hotels Pvt. Ltd is a lapsed building project in Pallikkere-Ii, Hosdurg, Kasaragod, Kerala. The site covers 28.3 acres.
Who is building it?
The applicant is Khanna Hotels Private Limited.
Has it been approved?
No. The application was lapsed on 3 Oct 2026, so it is no longer under consideration.
Where is it?
In Pallikkere-Ii, Hosdurg, Kasaragod, Kerala.
How big is it?
It has a stated cost of ₹2.2 crore and a site of 28.3 acres.
When was it filed?
The application was filed on 3 Jul 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 3 Oct 2026 |
| Application filed | 3 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Khanna Hotels Private Limited |
| Land area | 28.3 acres (11.5 ha) |
| Project cost | ₹2.2 crore |
| Village / locality | Pallikkere-Ii |
| Taluk / tehsil | Hosdurg |
| District | Kasaragod |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-01296 |
In context
6 applications in Kasaragod since January 2022 are in the same category (Buildings & townships): 2 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pallikkere-Ii, Hosdurg, Kasaragod, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying & Construction of 8″ & 4″ NB U/G Steel Pipeline Network & Associated… — coastal clearance granted, 1.5 km away
- Laterite Building Stone Quarry of Mr. Prakasha. B — environmental approval granted, 6.2 km away
- Reappraisal of Environment Clearance from DEIAA to SEIAA in respect of "M/s.… — lapsed, 8.3 km away
- Proposed Higher Educational Institution of "Emin International Academy" by… — under environmental review, 8.4 km away
- Laterite Building Stone Quarry of Narayanan. K — environmental approval granted, 10 km away
- Proposed Hospital Construction Project "Rachis Multispecialty Hospital" — withdrawn, 10.2 km away
- Proposed Construction of "RACHIS MULTI-SPECIALITY HOSPITAL" — environmental approval granted, 10.2 km away
- Laterite building stone quarry of Mr. Venu Nair P.P — environmental approval granted, 10.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.