Quick answers
What is Laterite Building Stone quarry of Noushad C K?
Laterite Building Stone quarry of Noushad C K is a proposed mining project in Vilayil, Kondotty, Malappuram, Kerala. The site covers 1.1 acres.
Who is building it?
The applicant is Noushad.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Vilayil, Kondotty, Malappuram, Kerala.
How big is it?
It has a stated cost of ₹16 lakh and a site of 1.1 acres.
When was it filed?
The application was filed on 8 Jan 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Laterite Building Stone Quarry of NOUSHAD C K
Project details
| Status | Under environmental review |
|---|---|
| Status since | 5 Nov 2026 |
| Application filed | 8 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Noushad |
| Land area | 1.1 acres (0.5 ha) |
| Project cost | ₹16 lakh |
| Village / locality | Vilayil |
| Taluk / tehsil | Kondotty |
| District | Malappuram |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-01330 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Jan 2026 (this page) | Under environmental review | 1.1 acres | ₹16 lakh |
| New project filed 21 Aug 2024 | Environmental approval granted | 0.9 acres | ₹9 lakh |
In context
335 applications in Malappuram since January 2022 are in the same category (Mining): 125 approved, 143 filed or under review, and 67 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 1.1 acres, this one is smaller than 83% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 4.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 15 mining leases have applied within 5 km.
Where it is
Vilayil, Kondotty, Malappuram, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laterite Building Stone quarry of Muhammed Razil K P — under environmental review, 50 m away
- Laterite Building Stone Quarry of Noushad C K — environmental approval granted, 50 m away
- Laterite Building Stone quarry of Abdul Azeez — under environmental review, 100 m away
- Laterite Building Stone Quarry of Haneefa Kottai — environmental approval granted, 100 m away
- Laterite Building Stone Quarry of Haneefa Kottai — environmental approval granted, 100 m away
- Laterite Building Stone Quarry of Haneefa Kottai — environmental approval granted, 200 m away
- Laterite Building Stone Quarry of NOUSHAD C K — environmental approval granted, 250 m away
- Laterite Building Stone Mine of Muhammed Rasil K.P — under environmental review, 350 m away
More from Noushad in Malappuram
- Laterite Building Stone Quarry of Noushad C K — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.