Quick answers
What is this project?
TRANSFER OF EC (No: 39/2017) FROM SAKKEER HUSSAIN TO NEDUNGAPRA REALTORS AND HOSPITALITY PRIVATE LIMITED is a proposed mining project in Na, Perinthalmanna, Malappuram, Kerala. The site covers 8.2 acres.
Who is building it?
The applicant is Adilsha Kudalil.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Na, Perinthalmanna, Malappuram, Kerala.
How big is it?
It has a stated cost of ₹1.7 crore and a site of 8.2 acres.
When was it filed?
The application was filed on 15 Jun 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 19 Aug 2026 |
| Application filed | 15 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Adilsha Kudalil |
| Land area | 8.2 acres (3.3 ha) |
| Project cost | ₹1.7 crore |
| Village / locality | Na |
| Taluk / tehsil | Perinthalmanna |
| District | Malappuram |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-01604 |
In context
335 applications in Malappuram since January 2022 are in the same category (Mining): 125 approved, 143 filed or under review, and 67 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 8.2 acres, this one is larger than 85% of them.
No other mining lease on record is within 500 m of this site; 20 have applied within 5 km.
Where it is
Na, Perinthalmanna, Malappuram, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Granite (Building Stone) Quarry of Sakkeer Hussain (Transfer Deiaa to Seiaa) — lapsed, 0 m away
- TRANSFER OF EC (No: 39/2017) FROM SAKKEER HUSSAIN TO NEDUNGAPRA REALTORS AND… — not approved, 0 m away
- Proposed Granite Building Stone Quarry Owned by Mr. Ajesh — under environmental review, 500 m away
- GRANITE BUILDING STONE QUARRY OF Mr. AJESH — under environmental review, 500 m away
- Transfer of EC Identification No EC25C0108KL5423408N from Alavikutty P. C to… — under environmental review, 1.1 km away
- Granite Building Stone Quarry of Alavikutty. P. C — environmental approval granted, 1.1 km away
- Laterite Building Stone Quarry of Sri. Ibrahim M.C — under environmental review, 1.6 km away
- Granite Building Stone Quarry of M/s P Vees Granites LLP — under environmental review, 2 km away
More from Adilsha Kudalil in Malappuram
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.