Quick answers
What is Laterite Building Stone Quarry of Damodara M?
Laterite Building Stone Quarry of Damodara M is a proposed mining project in Aduru, Kasaragod, Kerala. The site covers 0.5 acres.
Who is building it?
The applicant is Damodara M.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Aduru, Kasaragod, Kerala.
How big is it?
It has a stated cost of ₹7 lakh and a site of 0.5 acres.
When was it filed?
The application was filed on 11 Aug 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 3 Nov 2026 |
| Application filed | 11 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Damodara M |
| Land area | 1,900 m² |
| Project cost | ₹7 lakh |
| Village / locality | Aduru |
| Taluk / tehsil | Kasaragod |
| District | Kasaragod |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-01664 |
In context
64 applications in Kasaragod since January 2022 are in the same category (Mining): 22 approved, 28 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.5 acres, this one is smaller than 64% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Aduru, Kasaragod, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- LATERITE BUILDING STONE QUARRY OF Mr. BALAKRISHNA POOJARY — environmental approval granted, 850 m away
- Laterite Building Stone Quarry of Balakrishna Poojari — under environmental review, 950 m away
- Laterite Building Stone Quarry of Mr.Kasim EA — under environmental review, 5.8 km away
- Mulleria -Periyadka Road — under forest review, 6.6 km away
- Mulleria -Periyadka Road — lapsed, 6.6 km away
- 4G Saturation Project-USOF DoT BSNL Kannur BA Kasaragod District — forest land use approved, 7.1 km away
- Construction of Ug Cable From Parappa Depot to Mayyala — more information requested, 7.3 km away
- BSNL Enterprise Business for Kerala Gramin Bank — forest land use approved, 7.3 km away
About this information