Quick answers
What is KBIC - Project?
KBIC - Project is a rejected project in Pudusseri Central, Palakkad, Kerala. The site covers 168.6 acres.
Who is building it?
The applicant is Kerala Industrial Infrastructure Development Corporation.
Has it been approved?
No. The application was rejected on 27 Oct 2026.
Where is it?
In Pudusseri Central, Palakkad, Kerala.
How big is it?
It has a stated cost of ₹159 crore; a site of 168.6 acres and 168.6 acres (68.2 ha) of forest land.
When was it filed?
The application was filed on 15 Oct 2026.
Project details
| Status | Not approved |
|---|---|
| Status since | 27 Oct 2026 |
| Application filed | 15 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Kerala Industrial Infrastructure Development Corporation |
| Land area | 168.6 acres (68.2 ha) |
| Forest land | 168.6 acres (68.2 ha) |
| Project cost | ₹159 crore |
| Village / locality | Pudusseri Central |
| Taluk / tehsil | Palakkad |
| District | Palakkad |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-01715 |
In context
15 applications in Palakkad since January 2022 are in the same category (Other): 1 approved, 10 filed or under review, and 4 withdrawn, lapsed or rejected. At 168.6 acres, this one is larger than 93% of them.
33 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pudusseri Central, Palakkad, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Integrated Manufacturing Cluster (IMC) at Pudussery for Palakkad Node… — environmental approval granted, 500 m away
- Proposed Integrated Manufacturing Cluster (IMC) at Pudussery for Palakkad Node… — forest land use approved, 700 m away
- Proposed Integrated Manufacturing Cluster (IMC) at Pudussery for Palakkad Node… — cleared for impact study, 700 m away
- Kairali Sttels & Alloys Integrated Furnace and Hot Rolling Mill — environmental approval granted, 2.6 km away
- Kairali Sttels & Alloys Integrated Furnace and Hot Rolling Mill — more information requested, 2.6 km away
- Jal Jeevan Mission-WSS to Pudussery Panchayath in Palakkad district — forest land use approved, 3.1 km away
- Regularization of existing Mild Steel Re-Rolling mill by M/s. Lal Steels Pvt.… — lapsed, 3.1 km away
- Regularization of existing Mild Steel Re-Rolling mill by M/s. Lal Steels Pvt.… — more information requested, 3.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.