One of 2 filings for this project. The project's main page, with every filing and where each stands: Re Construction of Peruva Kadalkandam Bridge Across Mannayod River in Kolayad Grama…
Project details
| Official title | Re Construction of Peruva Kadalkandam Bridge Across Mannayod River in Kolayad Grama Panchayath in Kannur District.New Bridge at Kasa |
|---|---|
| Status | Lapsed |
| Status since | 18 Jul 2023 |
| Application filed | 19 Dec 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Scheduled Tribes Development Department |
| Land area | 1,700 m² |
| Forest land | 1,680 m² |
| Project cost | ₹2.3 crore |
| Village / locality | Koloyad |
| Taluk / tehsil | Thalassery |
| District | Kannur |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-01732 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Jan 2023 | Forest land use approved | 0.4 acres | ₹2.3 crore |
| New project filed 19 Dec 2022 (this page) | Lapsed | 0.4 acres | ₹2.3 crore |
In context
8 applications in Kannur since January 2022 are in the same category (Roads & highways): 1 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Koloyad, Thalassery, Kannur, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re Construction of Peruva Kadalkandam Bridge Across Mannayod River in Kolayad… — forest land use approved, 0 m away
- 4g Saturation Uso-Bsnl Project Kannur — more information requested, 1.3 km away
- Mission 500-BSNL-Kannur BA — lapsed, 1.3 km away
- Laterite Mining Plan of Jacob K J — environmental approval granted, 3.3 km away
- Granite Building Stone Quarry of M/s. Chendayad Granites Private Limited — under environmental review, 4.6 km away
- Granite Building Stone Quarry of M/s. Chendayad Granites Private Limited — cleared for impact study, 4.6 km away
- Granite Building Stone Quarry of M/s. Chendayad Granites Private Limited — lapsed, 4.6 km away
- Reappraisal of Building Stone (Quarry, Minor Mineral Mining) project of Mr.… — not approved, 4.7 km away
All 3 Scheduled Tribes Development Department projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.