Quick answers
What is this project?
Ottapalam Block Panchayath 2025-26 Kizhoor Kavilum Kunnath Drinking Water Project Division 6 Thrikkaderi Gramapanchayath is a lapsed water and irrigation project in Ananganadi, Ottappalam, Palakkad, Kerala. The site covers 0 acres.
Who is building it?
The applicant is Useph K a.
Has it been approved?
No. The application was lapsed on 29 Oct 2026, so it is no longer under consideration.
Where is it?
In Ananganadi, Ottappalam, Palakkad, Kerala.
How big is it?
It has a stated cost of ₹11 lakh; a site of 0 acres and 250 m² of forest land.
When was it filed?
The application was filed on 2 Jul 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2026 |
| Application filed | 2 Jul 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Water & irrigation |
| Applicant | Useph K a |
| Land area | 100 m² |
| Forest land | 250 m² |
| Project cost | ₹11 lakh |
| Village / locality | Ananganadi |
| Taluk / tehsil | Ottappalam |
| District | Palakkad |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-01872 |
In context
64 applications in Palakkad since January 2022 are in the same category (Water & irrigation): 44 approved, 8 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ananganadi, Ottappalam, Palakkad, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Keezhur Kavilumkunnu Dwss — initial checks, 50 m away
- Granite Building Stone Quarry of M/s New Galaxy Metals(Re appraisal) — lapsed, 3.4 km away
- Granite Building Stone Quarry of Mubarak Metal Crushing Unit — not approved, 3.5 km away
- Granite Building Stone Quarry of Mr. Ajayan Joseph — environmental approval granted, 3.5 km away
- Granite Building Stone Quarry of Mr. Ajayan Joseph — environmental approval granted, 3.5 km away
- Granite Building Stone Quarry of Sri.Abilash — under environmental review, 3.8 km away
- Granite Building Stone Quarry of Kishore Zacharia — under environmental review, 4.3 km away
- Granite Building Stone Quarry of M/s. Crushed Metal Products — environmental approval granted, 5.6 km away
More from Useph K a in Palakkad
- Keezhur Kavilumkunnu Dwss — initial checks
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.