Quick answers
What is this project?
Forest Clearance for Walayar Railway Station Road From NH With White/Black Topping in Existing Kuccha Road is a proposed railway project in Pudusseri East, Palakkad, Kerala. The site covers 0.1 acres.
Who is building it?
The applicant is Ministry of Railway.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Pudusseri East, Palakkad, Kerala.
How big is it?
It has a stated cost of ₹15 lakh; a site of 0.1 acres and 620 m² of forest land.
When was it filed?
The application was filed on 27 Jan 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 28 Jan 2026 |
| Application filed | 27 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | Ministry of Railway |
| Land area | 600 m² |
| Forest land | 620 m² |
| Project cost | ₹15 lakh |
| Village / locality | Pudusseri East |
| Taluk / tehsil | Palakkad |
| District | Palakkad |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-01946 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Jan 2026 (this page) | Initial checks | 0.1 acres | ₹15 lakh |
| Change of use filed 13 Jan 2026 | Lapsed | 0.1 acres | ₹15 lakh |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pudusseri East, Palakkad, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Forest Clearance for Walayar Railway Station Road From NH With White/Black… — lapsed, 0 m away
- Granite Building Stone quarry of M/s Azhakath Metals Granite Pvt Ltd — under environmental review, 3.7 km away
- Jal Jeevan Mission-WSS to Pudussery Panchayath in Palakkad district — forest land use approved, 3.9 km away
- Granite Building Stone quarry of M/s Palakkad Bluestone Private Limited… — under environmental review, 5.2 km away
- Environmental Clearance for the Proposed Educational Institution Sports School… — environmental approval granted, 6.2 km away
- Proposed Integrated Manufacturing Cluster (IMC) at Pudussery for Palakkad Node… — forest land use approved, 6.4 km away
- Proposed Integrated Manufacturing Cluster (IMC) at Pudussery for Palakkad Node… — cleared for impact study, 6.4 km away
- Proposed Integrated Manufacturing Cluster (IMC) at Pudussery for Palakkad Node… — environmental approval granted, 6.6 km away
All 149 Ministry of Railway projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.