Quick answers
What is Kainagiri Sudha Jala Vitharana Scheme Lever Committee?
Kainagiri Sudha Jala Vitharana Scheme Lever Committee is a rejected water and irrigation project in Mankulam, Devikulam, Idukki, Kerala. The site covers 0 acres.
Who is building it?
The applicant is Kainagiri Sudha Jala Vitharana Scheme Level.
Has it been approved?
No. The application was rejected on 1 Oct 2026.
Where is it?
In Mankulam, Devikulam, Idukki, Kerala.
How big is it?
It has a stated cost of ₹23.7 crore; a site of 0 acres and 60 m² of forest land.
When was it filed?
The application was filed on 12 Mar 2026.
Project details
| Status | Not approved |
|---|---|
| Status since | 1 Oct 2026 |
| Application filed | 12 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Kainagiri Sudha Jala Vitharana Scheme Level |
| Land area | 100 m² |
| Forest land | 60 m² |
| Project cost | ₹23.7 crore |
| Village / locality | Mankulam |
| Taluk / tehsil | Devikulam |
| District | Idukki |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-01961 |
In context
13 applications in Idukki since January 2022 are in the same category (Water & irrigation): 4 approved, 4 filed or under review, and 5 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mankulam, Devikulam, Idukki, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Electrification of Chambakattukudy under Electrical Section Marayoor — application filed, 450 m away
- 220kV Double Circuit Transmission line from Mankulam PH to Chattupara — under forest review, 5.3 km away
- 220kV Double Circuit Transmission line from Mankulam PH to Valara — lapsed, 5.4 km away
- Mission 500 Category 2_DFO Munnar — lapsed, 5.6 km away
- Glass Bridge, Hanging Bridge, Zip Line — lapsed, 7.6 km away
- Mission 500_DFO Mamkulam — more information requested, 8.3 km away
- JJM WSS TO Munnar GP Rajamal – Pettimudi zone — lapsed, 11.9 km away
- JJM WSS TO Munnar GP Rajamal – Pettimudi zone — application filed, 11.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.