Project details
| Status | Forest land use approved |
|---|---|
| Status since | 31 Oct 2026 |
| Application filed | 5 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 230 m² |
| Project cost | ₹50 lakh |
| Village / locality | Thenmala |
| Taluk / tehsil | Punalur |
| District | Kollam |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-01977 |
In context
16 applications in Kollam since January 2022 are in the same category (Telecom): 6 approved, 5 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2.8 years from filing to approval. At 0 acres, this one is smaller than 100% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Thenmala, Punalur, Kollam, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying 2.5 KM 11 KV XLPE (3Cx300sq.mm) underground cable from Ayyappankana to… — forest land use approved, 2.4 km away
- 4/6 Lane Aryankavu to Urukunnu Economic Corridor, Inter Corridor, Feeder… — lapsed, 4.2 km away
- Forest Title Deed — lapsed, 4.4 km away
- 4/6 Lane Highway (Including Tunnels) From Aryankavu (Near Tamilnadu/Kerala… — under forest review, 5.2 km away
- 4/6 Lane Highway (Including Tunnels) From Aryankavu (Near Tamilnadu/Kerala… — under environmental review, 5.2 km away
- Jal Jeevan Mission - Yeroor Grama Panchayat - Wss to Ayiranalloor Village -… — forest land use approved, 7.5 km away
- Providing 4g/5g Coverage To Uncovered Villages-kollam BA — lapsed, 7.6 km away
- Providing 4g/5g Coverage To Uncovered Villages-kollam BA — initial checks, 7.6 km away
More from Mahesh Nair in Kollam
- Providing 4g/5g Coverage To Uncovered Villages-kollam BA — forest land use approved
- Providing 4g/5g Coverage To Uncovered Villages-kollam BA — forest land use approved
- 4g Saturation Project_avenipara — lapsed
- Providing 4g/5g Coverage To Uncovered Villages-kollam BA — lapsed
- Providing 4g/5g Coverage To Uncovered Villages-kollam BA — initial checks
- Providing 4g/5g Coverage To Uncovered Villages-kollam BA — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.