One of 2 filings for this project. The project's main page, with every filing and where each stands: Lower Meenmutty Small Hydro Electric Project
Project details
| Status | Lapsed |
|---|---|
| Status since | 30 Jul 2025 |
| Application filed | 28 Jun 2025 |
| Approval sought | Forest land use |
| Application type | Renewal |
| Sector | Water & irrigation |
| Applicant | Kerala State Electricity Board Limited |
| Land area | 2,700 m² |
| Forest land | 2,650 m² |
| Project cost | ₹21.3 crore |
| Village / locality | Palod |
| Taluk / tehsil | Nedumangad |
| District | Thiruvananthapuram |
| State | Kerala |
| Location from | Taluk / tehsil |
| Our reference | WID-KL-02035 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Renewal filed 5 Jul 2025 | More information requested | 0.7 acres | ₹21.3 crore |
| Renewal filed 28 Jun 2025 (this page) | Lapsed | 0.7 acres | ₹21.3 crore |
In context
7 applications in Thiruvananthapuram since January 2022 are in the same category (Water & irrigation): 0 approved, 4 filed or under review, and 3 withdrawn, lapsed or rejected.
Where it is
Palod, Nedumangad, Thiruvananthapuram, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- JJM Anad-Nanniyode Phase III package-IV and VII Construction of 5.3 LL OHSR at… — lapsed, 3.2 km away
- JJM -2021-2024 Anad and Nanniyode Panchayaths - CWSS to Anad, Kurupuzha and… — lapsed, 3.2 km away
- Granite Building Stone Quarry of Joby Jose — lapsed, 3.6 km away
- Granite Building Stone Quarry of Joby Jose — lapsed, 3.6 km away
- Regularisation of Encroached Forest Land Occupied Prior to 01.01.1977 — lapsed, 3.7 km away
- Issuance of Patta to the Encroachers of Forest Land Occupied Prior to 01… — lapsed, 3.7 km away
- Oil Palm Research and Developement — more information requested, 4.1 km away
- Lower Meenmutty Small Hydro Electric Project — more information requested, 4.4 km away
All 17 Kerala State Electricity Board projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.