Quick answers
What is KR 10-88 Poriyani Kayyara Arimani Dhoni Road?
KR 10-88 Poriyani Kayyara Arimani Dhoni Road is a lapsed road project in Mundur-I, Palakkad, Kerala. The site covers 2.3 acres.
Who is building it?
The applicant is Programme Implementation Unit Constitutor.
Has it been approved?
No. The application was lapsed on 30 Apr 2026, so it is no longer under consideration.
Where is it?
In Mundur-I, Palakkad, Kerala.
How big is it?
It has a stated cost of ₹3.2 crore; a site of 2.3 acres and 2.3 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 30 Nov 2022.
Project details
| Status | Lapsed |
|---|---|
| Status since | 30 Apr 2026 |
| Application filed | 30 Nov 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Programme Implementation Unit Constitutor |
| Land area | 2.3 acres (0.9 ha) |
| Forest land | 2.3 acres (0.9 ha) |
| Project cost | ₹3.2 crore |
| Village / locality | Mundur-I |
| Taluk / tehsil | Palakkad |
| District | Palakkad |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-02155 |
In context
36 applications in Palakkad since January 2022 are in the same category (Roads & highways): 3 approved, 11 filed or under review, and 22 withdrawn, lapsed or rejected. At 2.3 acres, this one is larger than 97% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mundur-I, Palakkad, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Street Light along Poriyani Kayyara Arumani Road (PMGSY) — lapsed, 500 m away
- Jjm Puthuppariyaram Drinking Water Pipeline Work at Near Puthuppariyaram Water… — forest land use approved, 900 m away
- JJM Puthuppariyaram vendokkumpara ward 2 — forest land use approved, 1 km away
- Jjm Puthuppariyaram Pipe Laying Work Near Lead College — lapsed, 2.2 km away
- Jjm Puthuppariyaram Pipe Laying Work at Palopotta Bridge — forest land use approved, 2.3 km away
- Jjm Puthuppariyaram Muttikulangara-Dhoni Branch Road — forest land use approved, 2.6 km away
- Jjm-21-22 Laying Distribution System and Providing Fhtcs in Mundur Panchayath… — forest land use approved, 3 km away
- Granite Building Stone Quarry of M/s Mary Matha Granites — lapsed, 3.2 km away