Project details
| Official title | Proposed Commercial Building in RS NO:151/5, 151/6 and 152/3 Ward 62 at Kasaba Village and kozhikode municipal corporation |
|---|---|
| Status | Under coastal review |
| Status since | 2 Apr 2026 |
| Application filed | 2 Apr 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Fathima P P |
| Land area | 900 m² |
| Project cost | ₹4.2 crore |
| Village / locality | Kasaba |
| Taluk / tehsil | Kozhikode |
| District | Kozhikode |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-02561 |
In context
43 applications in Kozhikode since January 2022 are in the same category (Buildings & townships): 9 approved, 31 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 0.2 acres, this one is smaller than 100% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kasaba, Kozhikode, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for obtaining obtaining CRZ Clearance - Proposed Residential (A1… — lapsed, 200 m away
- Proposed Residential Building Construction Project to be developed by M/s… — more information requested, 1.4 km away
- Proposed Residential cum Commercial Building Construction project ("Golden… — under coastal review, 1.9 km away
- Composite Environmental Clearance and CRZ Clearance for the proposed… — under environmental review, 1.9 km away
- Laying, Expanding and Operating of Natural Gas Transportation Pipeline Network — coastal clearance granted, 3.3 km away
- Proposed Expansion of existing Commercial Complex Building construction… — under environmental review, 3.7 km away
- Environmental Clearance for the Proposed Expansion of existing Commercial… — lapsed, 3.7 km away
- Proposed Expansion of Existing Environmental Clearance for Construction of… — environmental approval granted, 3.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.