Quick answers
What is Formation Ammunition Storage Facility (Fasf) at Km-47?
Formation Ammunition Storage Facility (Fasf) at Km-47 is a proposed project in Na, Leh, Ladakh. The site covers 116.4 acres.
Who is building it?
The applicant is Ministry of Defense.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Na, Leh, Ladakh.
How big is it?
It has a stated cost of ₹83.8 crore and a site of 116.4 acres.
When was it filed?
The application was filed on 25 Mar 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 25 Mar 2025 |
| Application filed | 25 Mar 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Ministry of Defense |
| Land area | 116.4 acres (47.1 ha) |
| Project cost | ₹83.8 crore |
| Village / locality | Na |
| District | Leh |
| State | Ladakh |
| Location from | Site boundary on record |
| Our reference | WID-LA-00218 |
In context
218 applications in Leh since January 2022 are in the same category (Other): 1 approved, 210 filed or under review, and 0 withdrawn, lapsed or rejected. At 116.4 acres, this one is larger than 96% of them.
Where it is
Na, Leh, Ladakh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation Project at Between KM 23 to KM 56 — more information requested, 7.5 km away
- Army Camp ( Km- 56) — more information requested, 8.9 km away
- 4G Saturation Project at Between KM 56 to KM 80 — more information requested, 13.3 km away
- Short Range Surface to Air Missile (Srsam) Unit at Km-23 — under wildlife review, 14.9 km away
- Forward Aviation Base at Shyok — under wildlife review, 14.9 km away
- Forward Aviation Base (Fab) at Shyok — more information requested, 14.9 km away
- 4G Saturation Project at Km 80 — more information requested, 23.3 km away
- Transit Detachment (Km -80) — more information requested, 23.3 km away
More from Ministry of Defense in Leh
- Diversion of 2.018 Ha of Wildlife Sanctuary land for Construction of road… — under wildlife review
- 403 Field Hospital at Hunder — more information requested
- Construction/Improvement of Road Loma-Hanle From Cl-9 to NH Double Lane… — more information requested
- Diversion of 41.462 Ha of Wlc Land for Construction of Road Chushul to Chushul… — under wildlife review
- Storage Facility at Km-148 (II) — under wildlife review
- Storage Facilities at Punguk — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.