Quick answers
What is 4G Saturation Project 3.8 KM FM Airtel Tower Towards Loma-4?
4G Saturation Project 3.8 KM FM Airtel Tower Towards Loma-4 is a proposed telecom project in Na, Leh, Ladakh. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Na, Leh, Ladakh.
How big is it?
It has a stated cost of ₹25 lakh and a site of 0 acres.
When was it filed?
The application was filed on 1 Jul 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 1 Jul 2026 |
| Application filed | 1 Jul 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Project cost | ₹25 lakh |
| Village / locality | Na |
| Taluk / tehsil | Leh |
| District | Leh |
| State | Ladakh |
| Location from | Site boundary on record |
| Our reference | WID-LA-00329 |
In context
14 applications in Leh since January 2022 are in the same category (Telecom): 0 approved, 14 filed or under review, and 0 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Na, Leh, Ladakh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation Project 3.8 KM FM Airtel Tower Towards Loma-3 — under wildlife review, 0 m away
- 4G Saturation Project 3.8 KM FM Airtel Tower Towards Loma -2 — more information requested, 0 m away
- 4G Saturation Project 3.8 KM FM Airtel Tower Towards Loma (Loma 3.8 KM) — more information requested, 0 m away
- Construction/Improvement of Road Loma-Hanle From Cl-9 to NH Double Lane… — more information requested, 10.1 km away
- Stereo Mace System — under wildlife review, 10.9 km away
- Construction of Likaru Mig La-Fukche Road from km 0.000 to km 64.000 — more information requested, 11.2 km away
- Construction and Installation of Waste Disposal and Processing Plant — more information requested, 11.6 km away
- TEMPORARY LIVING ACCOMODATION WITH PREFEB SHELTERS INCLUDING LAND ACQUISITION… — under wildlife review, 13.3 km away
More from Mahesh Nair in Leh
- 4G Saturation Project at Sumdo — more information requested
- 4G Saturation Project at Puga — more information requested
- 4G Saturation Project at Mahe Bridge — more information requested
- 4G Saturation Project at Murgo Army 54 — more information requested
- 4G Saturation Project at Between Khalsar and Partapur — more information requested
- 4G Saturation Project at Anley — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.