Quick answers
What is this project?
Regularization of Manufacturing of M.S. Billets, Rolled Mild Steel Product (Induction Furnace) at Plot No. B-118, 119, 120, MIDC Industrial Area, Butibori, District Nagpur (Maharashtra). By: Meenakshi Re-Rollers Pvt. Ltd is a proposed industrial project in Umari, Hingna, Nagpur, Maharashtra. The site covers 6.5 acres.
Who is building it?
The applicant is Meenakshi Re Rollers Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Nov 2022), as of 27 Nov 2026.
Where is it?
In Umari, Hingna, Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹12.4 crore and a site of 6.5 acres.
When was it filed?
The application was filed on 24 Nov 2022.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Nov 2022 |
| Application filed | 24 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Meenakshi Re Rollers Private Limited |
| Land area | 6.5 acres (2.7 ha) |
| Project cost | ₹12.4 crore |
| Village / locality | Umari |
| Taluk / tehsil | Hingna |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-00061 |
In context
79 applications in Nagpur since January 2022 are in the same category (Industry): 51 approved, 13 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 6.5 acres, this one is smaller than 72% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Umari, Hingna, Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- MODIFICATION IN EXISTING AGROCHEMICAL PRODUCTS WITHOUT INCREASE IN TOTAL… — initial checks, 1.6 km away
- Amendment in existing EC of Pesticides Manufacturing Unit by M/s. Crystal Crop… — environmental approval granted, 1.6 km away
- Manufacturing of 2500 TPM Manganese Oxide Plot No. D-50 MIDC Butibori,… — environmental approval granted, 1.7 km away
- Manufacturing of 2500 TPM Manganese Oxide Plot No. D-50 MIDC Butibori,… — cleared for impact study, 1.7 km away
- Proposed Expansion of Industrial Shed Construction Project by Dinshaw's Dairy… — environmental approval granted, 1.9 km away
- Proposed Expansion of Industrial Shed Construction Project by Dinshaw's Dairy… — withdrawn, 1.9 km away
- Proposed Expansion of Industrial Shed Construction Project by Dinshaw's Dairy… — environmental approval granted, 1.9 km away
- Proposed Expansion of Industrial Shed Construction Project by Dinshaw's Dairy… — withdrawn, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.