Quick answers
What is this project?
Proposed Residential Development at- Village Kanjur by M/s. Kanakia Spaces Realty Pvt. Ltd is an approved building project in Kanjur, Mumbai Suburban, Maharashtra. The site covers 2.8 acres.
Who is building it?
The applicant is Ms Kanakia Spaces Reality P L.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Oct 2022), as of 27 Nov 2026.
Where is it?
In Kanjur, Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹4.4 crore and a site of 2.8 acres.
When was it filed?
The application was filed on 4 Oct 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Oct 2022 |
| Application filed | 4 Oct 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Ms Kanakia Spaces Reality P L |
| Land area | 2.8 acres (1.2 ha) |
| Project cost | ₹4.4 crore |
| Village / locality | Kanjur |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-00383 |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.8 acres, this one is larger than 62% of them.
305 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kanjur, Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (2.4 km away).
Other projects nearby
- Proposed Residential Project on plot A & B on Property bearing CTS No. 1016/1… — lapsed, 200 m away
- Building project by M/s RNA BUILDERS N.G. — withdrawn, 200 m away
- Application for EC (along with CtoE as per MoEF&CC Notifications G.S.R. 703(E)… — environmental approval granted, 350 m away
- Environmental Clearance for proposed SRA Scheme project under Reg. 33 (10) on… — lapsed, 350 m away
- Proposed development of Residential cum Commercial project under S.R. Scheme… — environmental approval granted, 350 m away
- Police Housing Reservation on Subdivided Plot 'A' On Property Bearing C.T.S.… — environmental approval granted, 400 m away
- Residential Development Along With Retail Shops — environmental approval granted, 400 m away
- Residential and Commercial Development at Village: Kanjurmarg, Tehsil: Kurla,… — environmental approval granted, 400 m away
More from Ms Kanakia Spaces Reality P L in Mumbai Suburban
- Proposed Redevelopment Project under DCR 33 (9) on plot bearing C.T.S. No.… — environmental approval granted
- Proposed Redevelopment Project under DCR 33 (9) on plot bearing C.T.S. No.… — withdrawn
- Proposed Redevelopment Project under DCR 33 (9) on plot bearing C.T.S. No.… — withdrawn
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.