What is Developing? Open the mapMap

Cleared for impact studyBuildings & townships · Mumbai, Maharashtra

Proposed Cluster Development Scheme for AARADHYA AVAAN Residential project on plot bearing C.S No.309, 1/309 & 2/309 of Division Tardeo, Mumbai-4000026 by Shreepati Skies AOP ( R. R. Chaturvedi )

Proposed Cluster Development Scheme for AARADHYA AVAAN Residential project on plot bearing C.S No.309, 1/309 & 2/309 of Division Tardeo, Mumbai-4000026 by Shreepati Skies AOP ( R. R. Chaturvedi ) is a proposed building project in Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The site covers 1.5 acres. Its stated project cost is ₹869 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 30 Nov 2022).

See it on the live map All projects in Mumbai

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Cluster Development Scheme for AARADHYA AVAAN Residential project on plot…

Project details

StatusCleared for impact study
Status since30 Nov 2022
Application filed30 Nov 2022
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantShreepati Skies (R R Chaturvedi)
Land area1.5 acres (0.6 ha)
Project cost₹869 crore
Village / localityGreater Mumbai (M Corp.)
Taluk / tehsilGreater Mumbai
DistrictMumbai
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-00428

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 13 Jan 2023Environmental approval granted1.5 acres₹869 crore
Early planning filed 30 Nov 2022 (this page)Cleared for impact study1.5 acres₹869 crore

In context

583 applications in Mumbai since January 2022 are in the same category (Buildings & townships): 446 approved, 58 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.5 acres, this one is smaller than 59% of them.

399 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Shreepati Skies (R R Chaturvedi) in Mumbai

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.