What is this project?
Regularization and Expansion of Operating Capacity (Aluminum Strips, Sheets, Foil and Aluminum Laminated Products) From 3250tpm (39000 Tpa) to 5250tpm (63000tpa) by Product Diversification Without Any Addition of Pollution Load is a proposed industrial project in Dahali, Mauda, Nagpur, Maharashtra. The site covers 248.1 acres.
Who is building it?
The applicant is Hindalco Industries Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 23 Nov 2023), as of 27 Nov 2026.
Where is it?
In Dahali, Mauda, Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹585.7 crore and a site of 248.1 acres.
When was it filed?
The application was filed on 23 Nov 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Nov 2023 |
| Application filed | 23 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Hindalco Industries Limited |
| Land area | 248.1 acres (100.4 ha) |
| Project cost | ₹585.7 crore |
| Village / locality | Dahali |
| Taluk / tehsil | Mauda |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-00773 |
In context
79 applications in Nagpur since January 2022 are in the same category (Industry): 51 approved, 13 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 248.1 acres, this one is larger than 82% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dahali, Mauda, Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regularization of Operating Capacity (Aluminum strips, sheets, foil and… — cleared for impact study, 0 m away
- Transfer of EC of Dahadi Sand Ghat, Kanhan River, Tq. Mauda, Dist. Nagpur,… — environmental approval granted, 700 m away
- Environment Clearance for Dahadi Sand Ghat over an extent of 1.05 ha at Kanhan… — environmental approval granted, 750 m away
- Environment Clearance for Dahadi Sand Ghat over an extent of 1.05 ha at Kanhan… — environmental approval granted, 750 m away
- Lift Irrigation Scheme on Kanhan River, near Old bridge, Village: Mathani… — environmental approval granted, 1.7 km away
- Proposed Grain Based Distillery Capacity 250 KLD Fuel Ethanol by M/s.… — environmental approval granted, 2.4 km away
- Environment Clearance for Kirnapur Sand Ghat over an extent of 4.95 ha at… — environmental approval granted, 3.8 km away
- Transfer of EC of Kirnapur Sand Ghat , River Kanhan ,Tq. Kamthi Dist. Nagpur,… — environmental approval granted, 3.9 km away
More from Hindalco Industries Limited in Nagpur
- Regularization of Operating Capacity (Aluminum strips, sheets, foil and… — cleared for impact study
All 38 Hindalco Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.