Quick answers
What is this project?
Residential cum Commercial project at Kh. No. 68/2,68/3,68/4,68/5 of village – Zari, PH. No. 3, Nagpur by Harihar Infrastructure Development Corporation Limited is an approved building project in Zari, Nagpur (Rural), Nagpur, Maharashtra. The site covers 10.9 acres.
Who is building it?
The applicant is Harihar Infrastructure Development Corporation Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Apr 2023), as of 27 Nov 2026.
Where is it?
In Zari, Nagpur (Rural), Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹45 lakh and a site of 10.9 acres.
When was it filed?
The application was filed on 18 Apr 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Apr 2023 |
| Application filed | 18 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Harihar Infrastructure Development Corporation Limited |
| Land area | 10.9 acres (4.4 ha) |
| Project cost | ₹45 lakh |
| Village / locality | Zari |
| Taluk / tehsil | Nagpur (Rural) |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-01175 |
What the filings say
What is planned
Harihar Infrastructure Development Corporation Limited is developing a residential and commercial complex on 4.41 hectares (10.89 acres) of land in Zari, Nagpur. The project layout includes 15 separate buildings of varying heights and classifications, including Economically Weaker Section (EWS), Low Income Group (LIG-I and LIG-II), and commercial components.
The residential buildings are planned as follows:
- Building 01 (EWS): Front wing with ground/stilts plus 9 floors (29.80 metres) and a rear wing with ground/stilts plus 10 floors (32.75 metres).
- Buildings 02 & 03 (EWS): Ground/stilts plus 9 floors (29.80 metres).
- Buildings 04 & 05 (LIG-I): Ground/stilts plus 11 floors (35.70 metres).
- Buildings 06, 07 & 08 (LIG-I): Ground/stilts plus 11 floors (36.95 metres).
- Buildings 12 & 13 (LIG-II): Ground/stilts plus 8 floors (27.70 metres).
- Buildings 14 & 15 (LIG-II): Ground/stilts plus 9 floors (31.15 metres).
The project also includes a fitness centre of 276.36 square metres across two floors and dedicated amenity spaces.
Layout and design
The site is bordered by an 18.00-metre wide Shiv Pandhan Road on two sides. Internal circulation is managed via 12.00-metre wide roads. The layout designates specific areas for recreational open space, totaling approximately 4,417 square metres across two main zones (1,898.10 square metres and 2,518.96 square metres). An additional amenity space of 2,211.73 square metres is provided.
Parking infrastructure includes composite stack parking for 22 cars and 132 scooters, along with a separate stack parking area for 50 vehicles. A portion of the site is reserved as a plot for future development.
Water, power and access
Water management infrastructure includes a domestic water tank with a capacity of 1,005 kilolitres per day (KLD) and a separate 24 KLD domestic tank. Fire safety is supported by a 525 KLD fire water tank. The project plans to treat sewage using two Sewage Treatment Plants (STP) with capacities of 905 KLD and 20 KLD. Treated water will be stored in flushing water tanks with capacities of 503 KLD and 12 KLD for reuse in flushing and gardening.
Power will be supplied through six 630 KVA transformers. For emergency backup, a 380 KVA Diesel Generator (DG) set is planned, to be located above the transformer room.
Environmental safeguards
The applicant's Environmental Management Plan (EMP) outlines measures for both construction and operational phases:
- Air and Noise: Dust reduction through road watering and periodic maintenance of machinery. DG sets will be housed in buildings with acoustic enclosures, and tree plantations will act as noise barriers.
- Waste Management: Construction debris will be recycled or reused. During operation, organic waste will be composted on-site, while non-compostable waste will be sent to landfills. Dry garbage will be sent for recycling.
- Water Conservation: Rainwater harvesting is proposed to recharge groundwater aquifers. The use of recycled water for flushing and gardening aims to reduce fresh water demand.
- Landscaping: The plan includes extensive tree plantation and gardening to compensate for vegetation loss and improve site aesthetics.
Harihar Infrastructure Development Residential Cum Commercial Project at Kh. No. 68/2,68/3,68/4,68/5 of Village – Zari, PH. No. 3, Nagpur site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
168 applications in Nagpur since January 2022 are in the same category (Buildings & townships): 128 approved, 22 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 10.9 acres, this one is larger than 61% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Zari, Nagpur (Rural), Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Residential & Commercial Project 'SHIV VISHVA' located at Parsodi,… — environmental approval granted, 3.3 km away
- Application of EC for Proposed Swasti Niwas – Residential Accommodation for… — environmental approval granted, 3.4 km away
- Environmental clearance for proposed Nursing care center by Aarya S. Trust — environmental approval granted, 4.2 km away
- Diversion of Forest Land for Construction of 12 Meter Wide Public Access Road… — lapsed, 4.2 km away
- "SHIV VISTARA" Proposed Residential and Commercial Project by OM Shivam… — environmental approval granted, 4.2 km away
- "Shiv Solitaire" Proposed Residential Project at Plot No. 8A Sector 21,… — environmental approval granted, 4.4 km away
- Proposed expansion of "FIRST CITY" Residential cum Commercial Development at… — cleared for impact study, 4.9 km away
- Application for expansion of "FIRST CITY" Residential cum Commercial… — environmental approval granted, 4.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.