Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Mar 2023 |
| Application filed | 30 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Praful Patel |
| Land area | 8.2 acres (3.3 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Jalu |
| Taluk / tehsil | Nandgaon-Khandeshwar |
| District | Amravati |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-01300 |
In context
233 applications in Amravati since January 2022 are in the same category (Mining): 221 approved, 4 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 8.2 acres, this one is larger than 81% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 14.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Jalu, Nandgaon-Khandeshwar, Amravati, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for Transfer of Environmental Clearance of Basalt Stone Quarry,… — initial checks, 0 m away
- Environmental Clearance for revalidation of Prior EC No.… — not approved, 350 m away
- Diversion of Forest Land for Construction of 100 MBBS Seat Government Medical… — more information requested, 6.8 km away
- Amravati Connectivity (SV-20 Bori Village to Amravati Bus Depot) — forest land use approved, 7.1 km away
- Construction and Electrification of New Cement Concrete Road,Drain,Paving… — lapsed, 10.3 km away
- PROPOSED GREENFIELD PROJECT OF STANDALONE GRINDING UNIT WITH CEMENT PRODUCTION… — environmental approval granted, 10.9 km away
- PROPOSED GREENFIELD PROJECT OF STANDALONE GRINDING UNIT WITH CEMENT PRODUCTION… — cleared for impact study, 10.9 km away
- Re-appraisal of Environmental Clearance for Stone Quarry Project (Area 1.62… — environmental approval granted, 11 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.