What is this project?
Environmental Clearance for Proposed Expansion of Existing Sugar Unit From 2,500 Tcd to 5,000 Tcd Capacity, Co-Generation Power Unit Expansion From 10 MW to 18 MW and Establishment of Syrup and Molasses Based Distillery Unit of 110 Kld Capacity for Manufacturing of Rs/Ena/Ethanol by M/S Sitaram Maharaj Sakhar Karkhana (Khardi) Limited is a withdrawn industrial project in Khardi, Pandharpur, Solapur, Maharashtra. The site covers 39 acres.
Who is building it?
The applicant is Sitaram Maharaj Sakhar Karkhana (Khardi) Limited.
Has it been approved?
No. The application was withdrawn on 31 Jul 2023, so it is no longer under consideration.
Where is it?
In Khardi, Pandharpur, Solapur, Maharashtra.
How big is it?
It has a stated cost of ₹435.9 crore and a site of 39 acres.
When was it filed?
The application was filed on 10 May 2023.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance for Proposed Expansion of Existing Sugar Unit From 2,500 Tcd to…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 31 Jul 2023 |
| Application filed | 10 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Sitaram Maharaj Sakhar Karkhana (Khardi) Limited |
| Land area | 39 acres (15.8 ha) |
| Project cost | ₹435.9 crore |
| Village / locality | Khardi |
| Taluk / tehsil | Pandharpur |
| District | Solapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-01381 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 27 Jul 2026 | Lapsed | 39 acres | ₹435.9 crore |
| New project filed 21 Aug 2023 | Environmental approval granted | 39 acres | ₹435.9 crore |
| Early planning filed 10 May 2023 (this page) | Withdrawn | 39 acres | ₹435.9 crore |
In context
76 applications in Solapur since January 2022 are in the same category (Industry): 50 approved, 11 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 39 acres, this one is larger than 53% of them.
Where it is
Khardi, Pandharpur, Solapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Proposed Expansion of Existing Sugar Unit From… — lapsed, 0 m away
- Environmental Clearance for Proposed Expansion of Existing Sugar Unit From… — environmental approval granted, 0 m away
- Diversion of Forest Land for Construction of an Approach Road to Upcoming… — forest land use approved, 8.2 km away
- Stone quarry proposal of Shri. Nagesh Ekanath Phate at Gat no- 153/2/B/1/B/2… — under environmental review, 9.8 km away
- Diversion of Forest Land for Laying of Underground Ofc Duct & Cable Within Row… — lapsed, 17.3 km away
- Application for Transfer of Environmental Clearance of… — environmental approval granted, 17.5 km away
- Environmental Clearance for the Shirdhhon- Chincholibhose sand Spot over Bhima… — environmental approval granted, 17.5 km away
- Environmental Clearance for the Shirdhhon- Chincholibhose sand Spot over Bhima… — withdrawn, 17.5 km away
All 3 Sitaram Maharaj Sakhar projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.