Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Dec 2023 |
| Application filed | 5 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shri. Vikas Chandrakant Hadkar |
| Land area | 2.9 acres (1.2 ha) |
| Project cost | ₹65 lakh |
| Village / locality | Kudopi |
| Taluk / tehsil | Malwan |
| District | Sindhudurg |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-01514 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Dec 2023 (this page) | Environmental approval granted | 2.9 acres | ₹65 lakh |
| New project filed 4 May 2023 | Under environmental review | 2.9 acres | ₹65 lakh |
In context
61 applications in Sindhudurg since January 2022 are in the same category (Mining): 34 approved, 10 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 2.9 acres, this one is smaller than 95% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Kudopi, Malwan, Sindhudurg, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri. Vikas Chandrakant Hadkar — under environmental review, 0 m away
- Smt. Vaibhavi Vikas Hadkar — environmental approval granted, 2 km away
- Ajay Mahadev Satam — environmental approval granted, 5.2 km away
- High-level Bridge in place of Causeway at Achara (Bandar) Varwade Kankavli… — under coastal review, 8.5 km away
- Anti sea erosion bund (length -296.72 m) — recommended by coastal authority, 8.7 km away
- Anti Sea Erosion Bund (Length - 603.52 M) — recommended by coastal authority, 9.2 km away
- Anti Sea Erosion Bund (120.23) is — recommended by coastal authority, 9.6 km away
- Groyne Bunds and Dredging in Navigational Channel at Tambaldeg, Taluka-… — lapsed, 9.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.