Quick answers
What is this project?
Expansion for proposed 'Nirmal Lifestyle' – Commercial and Residential Project at CTS No. 491/A, 491/A/1/A, 191/A/1/B, 491/A/2/A, 491/A/3 & 4, 491/A/7 & 8, 491/B of Village Nahur, Mulund (West) is a proposed building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 27.1 acres.
Who is building it?
The applicant is Nirmal Lifestyle Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 10 Oct 2023), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹928 crore and a site of 27.1 acres.
When was it filed?
The application was filed on 10 Oct 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 10 Oct 2023 |
| Application filed | 10 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Nirmal Lifestyle Limited |
| Land area | 27.1 acres (11 ha) |
| Project cost | ₹928 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-01605 |
What the filings say
What is planned
Nirmal Lifestyle Limited is proposing an expansion of its existing commercial and residential project in Mulund (West). The development is planned on a net plot area of 1,09,475 square metres, with a total construction area of 4,21,789 square metres. The project comprises six buildings with various wings and configurations.
The applicant's project report details the following building configurations:
- Building No. 1: Ground floor to 2nd floor, plus 3rd to 8th floors, and partial 9th, 10th, and 11th floors.
- Building No. 2 (Wing A-E): Stilt plus 1st to 16th floors.
- Building No. 3: Ground plus 1st to 2nd floors with a dome.
- Building No. 3B: Ground plus 1st to 4th floors for commercial use. This includes a parking building with two basement levels, a ground floor, and nine parking levels.
- Building No. 4 (Wings A-D): Stilt plus a partial 1st floor and 2nd to 19th floors.
- Building No. 4 (Wings E-F): Stilt plus a partial 1st floor and 2nd to 21st floor.
- Building No. 5: Two basement levels, ground floor, six levels of podium, stilt, and 8th to 33rd floors.
- Building No. 6 (Wing A): Lower ground, upper ground, four podium levels, stilt, and 1st to 30th floors.
- Building No. 6 (Wings B & C): Lower ground, upper ground, four podium levels, stilt, and 1st to 39th floors.
Upon completion, the project is estimated to accommodate approximately 29,544 users. During the construction phase, about 10,000 workers are expected to be deployed on-site.
Layout and design
The site is divided into sub-plots (A1, A2, and A3). The layout includes a 16.80-metre wide internal access road and an 18.30-metre wide Development Plan (DP) road. A dedicated space for a receiving station and multiple sub-stations are planned. The design incorporates a large central porch area near Building 3 and 3B. Recreational Ground (RG) areas are distributed across the site, including RG on ground, on podiums, and at lower ground levels.
Land and surroundings
The project is located at Village Nahur in the Mumbai Suburban district. The site is well-connected to the Goa-Goregaon Link Road, which abuts the property. The Nahur Railway Station is approximately 2.2 km away, and Chhatrapati Shivaji Maharaj International Airport is 13.9 km from the site. Local infrastructure within 1.5 km includes Fortis Hospital, Nutan Sarasvati High School, and various banks and restaurants.
Water, power and access
During the operational phase, the total water requirement is estimated at 1,072 kilolitres per day (KLD) for domestic purposes, which will be sourced from the Municipal Corporation of Greater Mumbai (MCGM). An additional 695 KLD for flushing and 192 KLD for gardening will be met using recycled water from an on-site Sewage Treatment Plant (STP). The total sewage generation is expected to be 1,598 KLD.
Electrical power will be sourced from Tata Power. The connected load is estimated at 39,447 kW, with a demand load of 17,434 kW.
Environmental safeguards
The project will generate approximately 3,445.22 kg/day of biodegradable waste, which will be treated on-site using an Organic Waste Converter (OWC). Non-biodegradable waste, estimated at 5,167.83 kg/day, will be handed over to the municipal authority.
A total of 38,688.73 square metres is designated for green belt and recreational ground areas. Baseline monitoring conducted between February and April 2023 noted that while most air quality parameters were within limits, PM10 and PM2.5 levels exceeded standards at some locations. Ambient noise levels were also found to be higher than prescribed standards. The applicant intends to plant common urban trees such as Gulmohar, Copper Pod, and False Ashok.
Expansion for 'Nirmal Lifestyle' – Commercial and Residential Project site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 27.1 acres, this one is larger than 94% of them.
242 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (2.6 km away).
Other projects nearby
- Expansion of 'Nirmal Lifestyle' – Commercial and Residential Project at CTS… — lapsed, 0 m away
- Proposed Amendment and expansion in EC for construction of residential project… — environmental approval granted, 150 m away
- Proposed Amendment and expansion in EC for construction of residential project… — cleared for impact study, 150 m away
- Proposed Amendment and expansion in EC for construction of residential project… — cleared for impact study, 150 m away
- Proposed Amendment & Expansion in EC for Residential Development "Piramal… — lapsed, 150 m away
- Slum Rehabilitation Scheme (SRA) on plot bearing C.T.S No. 509, 510, 510/1 to… — cleared for impact study, 150 m away
- Proposed Expansion for Bldg.7 & 10 on Plot Bearing New CTS No. 514A, & old… — withdrawn, 350 m away
- Proposed Expansion for Bldg.7 & 10 on Plot Bearing New CTS No. 514A, & old… — cleared for impact study, 350 m away
More from Nirmal Lifestyle Limited in Mumbai Suburban
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.