Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 28 Dec 2023 |
| Application filed | 28 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Surya Center Treatment Facility Private Limited |
| Land area | 3,700 m² |
| Project cost | ₹5.5 crore |
| Village / locality | Miraj |
| Taluk / tehsil | Miraj |
| District | Sangli |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-02293 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 28 Dec 2023 (this page) | Cleared for impact study | 0.9 acres | ₹5.5 crore |
| Early planning filed 6 Jun 2023 | Cleared for impact study | 0.9 acres | ₹5.5 crore |
In context
6 applications in Sangli since January 2022 are in the same category (Waste management): 2 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Miraj, Sangli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Waste management project by Surya Center Treatment Facility Private Limited. — cleared for impact study, 0 m away
- Expansion of Existing Common Bio- Medical Waste Management Treatment Facility… — not approved, 100 m away
- Environmental Clearance for proposed industrial shed project at Plot No. E-5… — not approved, 3.3 km away
- Environmental Clearance for Proposed Expansion of Existing API Intermediate… — cleared for impact study, 3.8 km away
- Proposed Police Housing Project Located at CTS. No.7502, Vishrambaug, Sangli,… — environmental approval granted, 5.2 km away
- Proposed Residential Project at Sangli by M/s DSDB Realty LLP — environmental approval granted, 5.3 km away
- Proposed Project at Sangli by M/s. Siddhivinayak Platinum — environmental approval granted, 6.6 km away
- Environmental Clearance for Basalt Stone Mining Project (1.00 Ha) at Survey… — environmental approval granted, 10.8 km away
More from Surya Center Treatment Facility Private Limited in Sangli
All 3 Surya Center Treatment projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.