Quick answers
What is this project?
Proposed Integrated Township Project (Mixed Use Development) develop at Gut No.16/8A & 16/8B, Wangani Tarf Taloje, Tal. Panvel, Dist. Raigad - 410206, Maharashtra being developed by Mr. Prakash Bhimrao Baviskar & Others is a proposed building project in Wangani Tarf Taloje, Panvel, Raigarh, Maharashtra. The site covers 117.9 acres.
Who is building it?
The applicant is Prakash Baviskar.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 14 Dec 2023), as of 27 Nov 2026.
Where is it?
In Wangani Tarf Taloje, Panvel, Raigarh, Maharashtra.
How big is it?
It has a site of 117.9 acres.
When was it filed?
The application was filed on 14 Dec 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 14 Dec 2023 |
| Application filed | 14 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Prakash Baviskar |
| Land area | 117.9 acres (47.7 ha) |
| Village / locality | Wangani Tarf Taloje |
| Taluk / tehsil | Panvel |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-02456 |
In context
674 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 403 approved, 85 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 117.9 acres, this one is larger than 93% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Wangani Tarf Taloje, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Water Supply Pipeline for ITP, Wangani Tarf Taloje — in-principle approval, conditions pending, 550 m away
- Data Center Project "ACXNMI Site-03" by M/s Adani Infra (India) Limited — cleared for impact study, 5.2 km away
- Environmental Clearance for manufacturing of proposed API's and Intermediates… — cleared for impact study, 6 km away
- Application for Consent to Operate With Change in Product Mix in Existing… — initial checks, 6.1 km away
- Application for Consent to Operate With Change in Product Mix in Existing… — initial checks, 6.1 km away
- Application for Amendment in Consent to Operate with Change in Product Mix in… — initial checks, 6.1 km away
- Manufacture of Bentonite- -Sulphur Pastilles(50,000 TPA) at Plot No.K-7, MIDC,… — environmental approval granted, 6.2 km away
- Approach Road — more information requested, 6.6 km away
More from Prakash Baviskar in Raigarh
- Water Supply Pipeline for ITP, Wangani Tarf Taloje — in-principle approval, conditions pending
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.