What is Developing? Open the mapMap

Cleared for impact studyIndustry · Solapur, Maharashtra

100 KLPD Distillery using C / B Heavy Molasses / Sugarcane Syrup

100 KLPD Distillery using C / B Heavy Molasses / Sugarcane Syrup is a proposed industrial project in Ashti, Mohol, Solapur, Maharashtra. The site covers 84.7 acres. Its stated project cost is ₹404.1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 25 Mar 2023).

See it on the live map All projects in Solapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

100 KLPD Distillery using C / B Heavy Molasses / Sugarcane Syrup is a proposed industrial project in Ashti, Mohol, Solapur, Maharashtra. The site covers 84.7 acres.

Who is building it?

The applicant is Ashti Sugar Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 25 Mar 2023), as of 27 Nov 2026.

Where is it?

In Ashti, Mohol, Solapur, Maharashtra.

How big is it?

It has a stated cost of ₹404.1 crore and a site of 84.7 acres.

When was it filed?

The application was filed on 25 Mar 2023.

Project details

Official titleEstablishment of 100 KLPD Distillery using C / B Heavy Molasses / Sugarcane Syrup along with Expansion of Sugar Factory (2500 to 7500 TCD), Co-generation Plant (10 to 25 MW) by Ashti Sugar Limited (ASL), A/p.: Ashti, Tal. : Mohol, Dist. : Solapur, Maharashtra
StatusCleared for impact study
Status since25 Mar 2023
Application filed25 Mar 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantAshti Sugar Limited
Land area84.7 acres (34.3 ha)
Project cost₹404.1 crore
Village / localityAshti
Taluk / tehsilMohol
DistrictSolapur
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-02700

In context

76 applications in Solapur since January 2022 are in the same category (Industry): 50 approved, 11 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 84.7 acres, this one is larger than 72% of them.

Where it is

Ashti, Mohol, Solapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.