Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Dec 2023 |
| Application filed | 11 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Dosti Enterprises |
| Land area | 3.7 acres (1.5 ha) |
| Project cost | ₹180 crore |
| Village / locality | Balkum Tarf Thane |
| Taluk / tehsil | Thane |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-02817 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 May 2024 | Withdrawn | 3.6 acres | ₹180 crore |
| New project filed 11 Dec 2023 (this page) | Environmental approval granted | 3.7 acres | ₹180 crore |
In context
1,540 applications in Thane since January 2022 are in the same category (Buildings & townships): 1,001 approved, 200 filed or under review, and 339 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.7 acres, this one is smaller than 53% of them.
299 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Balkum Tarf Thane, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Commercial Development project located at Plot B & C, Bhiwandi -… — withdrawn, 0 m away
- Residential Building on Plot bearing S. No. - 19/20/43A, S.NO.-25/22/9A, S.… — lapsed, 250 m away
- Proposed amendment / expansion in EC for Residential cum Commercial project… — environmental approval granted, 350 m away
- Proposed Redevelopment Project on plot bearing CTS No. 1317, Village: Balkum,… — environmental approval granted, 350 m away
- Proposed amendment / expansion in EC for Residential cum Commercial project… — cleared for impact study, 400 m away
- Application for Amendment and Expansion in EC (along with Consent to Establish… — cleared for impact study, 400 m away
- PROPOSED COMPLEX ON PLOT BEARING NEW S.NO.19/1B, 19/2 to 19/5, 19/6(pt.),… — cleared for impact study, 450 m away
- Kalpataru park city ,Transfer of EC for the project viz. " Environment… — environmental approval granted, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.